CH-TR-204-01 / DRAFT 0.1 Guard reference and configuration review Concept training draft — not an approved plant operating SOP Model CHEM-P204-01 v0.1 Use only the fictional inert model. A task owner must validate source, revision, mechanics and evidence before any real-equipment lesson. This page does not authorize physical work. 01. Establish the training boundary Action: Confirm that this is the fictional inert P-204 concept model. Check: No plant work or operating authority is implied. Components: P-204 02. Check the source and revision Action: Read model CHEM-P204-01 v0.1 and this draft identifier. Check: The model and procedure versions match. Components: P-204 03. Orient the assembly Action: Locate the blue pump, grey motor and stationary coupling in 3D. Check: Pump left, motor right; coupling remains stationary. Components: P-204, M-204, C-204 04. Identify the correct guard Action: Select G-204-A and compare its identity with the equipment record. Check: G-204-A is distinct from the separate G-205-B spare. Components: G-204-A, G-205-B 05. Compare the mounting footprint Action: Orbit the model and inspect the correct guard feet and fixed recessed pads. Check: All four intended mounting locations are identifiable; geometry is illustrative. Components: G-204-A 06. Locate the front pair Action: Select CG-01, then CG-03, using the part picker or model. Check: Both front identities are recorded separately. Components: CG-01, CG-03 07. Inspect the rear pair Action: Orbit to inspect CG-02 and CG-04. Check: A front image is not treated as rear fastening evidence. Components: CG-02, CG-04 08. Distinguish retained parts and tools Action: Inspect the captive groups and separate keyed tool geometry. Check: No threads, applied torque or continuous tool transfer are claimed. Components: CG-01, CG-02, CG-03, CG-04 09. Explore assembly ownership Action: Use the exploded inspection view to see which parts belong to the guard assembly. Check: The view is an illustration of grouping, not an approved removal sequence. Components: G-204-A, C-204 10. Restore the assembled inspection view Action: Reassemble the viewer and compare the source again. Check: Correct guard identity and mounting context remain consistent. Components: G-204-A 11. State the review decision Action: Describe whether the supplied concept references are sufficient for the training example. Check: Any unverified fit, clearance or retention requirement remains a review item. Components: G-204-A 12. Prepare the receiving handover Action: Link the configuration review to the receiving evidence draft. Check: Guard review alone is not an operational release or a complete line-up record. Components: P-204, L-204-D ASSESSMENT Assess identity, front/rear pair recognition and the explanation of source limits. A simulated configuration score does not establish real fastening or readiness. Draft for review and future Genesis authoring; not a published Chemicals simulator.