CH-TR-204-02 / DRAFT 0.1 Wrong-spare choice, HOLD and reviewed recovery Concept training draft — not an approved plant operating SOP Model CHEM-P204-01 v0.1 Use only the fictional inert model. A task owner must validate source, revision, mechanics and evidence before any real-equipment lesson. This page does not authorize physical work. 01. Confirm the task context Action: Identify P-204 and the current concept training draft. Check: Use the same model/version as the configuration review. Components: P-204 02. Locate the expected part Action: Select G-204-A as the expected coupling guard identity. Check: The expected ID is explicit before comparing the spare. Components: G-204-A 03. Inspect the offered spare Action: Select G-205-B in the separate tray. Check: The spare remains separate from the installed guard. Components: G-205-B 04. Compare the two footprints Action: Orbit and compare the visible feet and source identities. Check: The offered spare has a different mounting footprint. Components: G-204-A, G-205-B 05. Make the choice visible Action: Record that G-205-B is not interchangeable on the supplied concept mounts. Check: Do not force-fit, snap or silently rename the wrong spare. Components: G-205-B 06. Hold the proposed step Action: Keep the selection on HOLD while the mismatch is unresolved. Check: No successful-fit or completion state is awarded. Components: G-205-B 07. Explain the mismatch Action: Name the observed ID and footprint difference in the review record. Check: The reason is concrete, not a generic error message. Components: G-205-B, G-204-A 08. Request qualified review Action: Refer the discrepancy to the task/source owner. Check: A learner cannot self-approve a different physical part. Components: P-204 09. Review the correct training source Action: Compare the source-checked G-204-A identity and intended mounts. Check: Only the reviewed training choice is eligible for recovery. Components: G-204-A 10. Recover the training decision Action: Select G-204-A and repeat the configuration review. Check: The wrong spare remains in its tray; recovery is documented. Components: G-204-A, G-205-B 11. Keep independent evidence gaps open Action: Check whether receiving line-up evidence is supplied. Check: Correct spare selection does not resolve missing line evidence. Components: L-204-D 12. Record feedback for the next rehearsal Action: Retain the choice, reason, review and recovery in the training record. Check: The proposed lesson is reviewed before reuse. Components: P-204, G-204-A ASSESSMENT The critical gate is refusing the wrong-footprint spare. Feedback should name the mismatch, explain the HOLD and permit a source-checked retry; no operational release is scored. Draft for review and future Genesis authoring; not a published Chemicals simulator.